摘要: |
简要介绍了中煤陕西榆林能源化工有限公司煤制烯烃项目一期的基本情况。分析了影响煤制烯烃企业各主生产装置高负荷运行的因素及提高运行负荷的方法。结合实际生产经验,总结了煤制烯烃企业延长运行周期的措施,确定了煤制烯烃企业最佳的生产负荷,可供同类企业借鉴参考。 |
关键词: 煤制烯烃 高负荷 影响因素 措施 经济效益 |
DOI:10.3969/j.issn.1007-3426.2018.02.010 |
分类号: |
基金项目: |
|
A simple study on the increasing load of the production units in coal-to-olefin enterprises |
Bai Yongwei, Li Heping, Yang Jinlong
|
China Coal Shaanxi Yulin Energy Chemical Co., Ltd, Yulin, Shaanxi, China
|
Abstract: |
The basic situation of the coal-to-olefin project phase I of China Coal Shaanxi Yulin Energy Chemical Co., Ltd is briefly introduced in this paper. The factors affecting the high load operation of the main production units and the methods to improve the operating load are analyzed. Based on the actual production experience, the measures to extend the operation cycle are summarized and the optimal production load of the coal-to-olefin enterprises is determined. This can be a reference for similar enterprises. |
Key words: coal-to-olefin high load influencing factor measure economic benefits |